Thousand Oaks Single Story Homes for Sale

Open Map
49 Matches Found
1 2 Next
Information deemed reliable but not guaranteed.

Thousand Oaks single-story homes at a glance

  • Marked single story in the MLS: Single-story homes for sale in Thousand Oaks, CA land on this page through the MLS single-story field alone, so the grid can mix detached houses with one-level condos.
  • Over half built 1960 to 1979: The Housing Element’s Census table puts about 53 percent of the City’s occupied homes in those two decades, with older housing clustered in the center of the City near the State Route 23 and US-101 interchange.
  • 25 feet in the main residential zones: As of 2026, the Municipal Code caps a main building in the R-A, R-E, R-O, R-1 and R-2 zones at 25 feet, or up to 35 feet with two 15-foot side yards, never above three stories. Single-family homes in R-P-D zones stay at 25 feet, so check the lot’s zone.

Adding a second story

Side yards set the practical limit. As of 2026, a one-story house in the R-A through R-2 zones needs at least five feet on each side. Going up changes the math: a side yard next to a two-story wall must equal at least 10 percent of the lot’s width, and a two-story wall with windows needs 10 feet. Some tracts mapped between December 1961 and January 1964 are partly exempt, so ask the Planning Division which rule fits the lot.

Hillside lots add review. Land on the City’s Hillside Development District Map, generally averaging a 10 percent slope or more before grading, can be zoned H-P-D, where the code favors minimal grading that follows natural contours; the Housing Element lists a Planning Commission hillside permit for a single-family home there. For a 1960s tract, see Eichler homes.

Thousand Oaks single-story questions, answered

How large can a backyard ADU be?

As of 2026, after an amendment effective April 10, 2026, the City’s ADU rules allow a detached unit up to 1,000 square feet and generally 16 feet tall, four feet from side and rear lines and six feet from other buildings. An attached unit may reach 850 square feet or half the house’s floor area, whichever is larger, must share at least 10 feet of wall and cannot connect inside. No ADU may sit on natural slope steeper than 25 percent.

Does an ADU permit go to a hearing?

No. As of 2026, the City reviews ADU applications ministerially, without a hearing. Completeness is decided within 15 business days, and a complete application is approved or denied within 60 days when a home already stands on the lot. Where City rules conflict with state ADU law, state law controls. Compare new construction or all Thousand Oaks homes for sale with a Thousand Oaks real estate agent.